LessonsDay 27 — Thermal budgets / duty-cycle scheduling

Day 27 — Thermal budgets / duty-cycle scheduling as measured constraints under supervisor + logging + canary + HIL + fleet + fleet-canary + incident + forensics/reopen + change-management + maintenance gates

ThermalStateEstimator / ThermalHeadroomForecaster / DutyCycleScheduler / ThermalAdmissionGate: per-joint winding and housing temperatures, gearbox lubricant, battery pack, drive and compute temperatures are MEASURED (thermistors, winding resistance, BMS cells, SoC sensors, clock read-back) and fused by a per-unit two-node thermal observer; the twin forecasts a pessimistic temperature band over the task horizon (soft); the scheduler orders tasks, inserts rests, swaps limbs and picks cheaper postures (soft); ThermalAdmissionGate fails closed unless the pessimistic forecast plus a safe-stop reserve stays below the planner ceiling, which sits under Day 05's derate start; Day 05 alone owns derate, torque_scale and POWER_GATED; soft channels dashed, measured / Day 05 solid

Day 26 owned ActuatorHealthProbe / DriftEstimator / MaintenanceScheduler / RecalibrationGate: wear is measured by a fixed probe per joint, in a known temperature band, and fixed only by a signed per-unit calibration event. Day 25 owned typed ChangeSets and attestation. Days 17–24 owned the kill-chain, logging, eval, canary, the HIL farm, the fleet, incidents, and forensics. Day 05 owns torque_scale, POWER_GATED, thermal derate, and the hard kill latch per robot, forever.

Day 26 kept saying “in a known temperature band” and Day 05 kept saying “thermal derate.” Today is about the thing in between: heat is the budget every joint is spending all the time, and it runs out on a schedule you can predict. A humanoid almost never fails a task because a motor can’t make the torque. It fails because the motor could make it thirty seconds ago and now Day 05 has scaled it down, halfway through carrying a box up a step.

Today owns ThermalStateEstimator / ThermalHeadroomForecaster / DutyCycleScheduler / ThermalAdmissionGate. The question is: how much torque does each joint really have over the next ten minutes, how do you plan work against that without the planner ever touching Day 05’s derate, and how does the twin see a derate coming before the robot walks into one?

Why heat is a budget, not a limit

A torque limit is a number. A thermal limit is an integral. The same knee can deliver a large torque for two seconds, a moderate torque for two minutes, and only its continuous rating forever, and which of those it can do right now depends on everything it did in the last ten minutes.

Three properties make heat dangerous in a humanoid specifically:

  • Gravity never turns off. An arm resting on a table costs nothing. A humanoid standing still with bent knees is pushing continuous current through its knee and hip motors just to not fall. Standing is work.
  • The stack hides it, again. Exactly like Day 26’s wear, the whole-body controller just asks for more current when a joint gets weaker, and the robot looks fine until Day 05 steps in.
  • The thing that saves you also needs heat. Push recovery (Day 09), an emergency step, or a controlled sit-down is the highest-torque motion the robot ever makes. If the budget is spent when the push arrives, the safe reaction isn’t available.

So the first rule of today: plan against a forecast of heat, keep a reserve for stopping, and treat Day 05’s derate as a floor you never plan to touch, not a ceiling you plan up to.

LayerOwnsMust not own
Sensors + drives + BMS + SoCMEASURED temperatures: winding thermistor, housing, winding resistance at rest, gearbox, drive MOSFETs, pack cells, brake resistor, SoC junction, ambient; read-back clock frequencyDeciding what work happens
ThermalStateEstimator (per unit, per joint)ESTIMATED hot-spot temperature from a per-unit two-node model fused with MEASURED sensors; model-validity residualLabeling its estimate MEASURED; acting on derate
ThermalHeadroomForecaster (twin)SOFT pessimistic / median temperature bands over the task horizon; time-to-planner-ceiling; safe-stop reserve per jointWriting torque_scale; being trusted without a validity check
DutyCycleSchedulerSOFT task order, rest insertion, limb alternation, posture preference, payload splitting, graceful sheddingRunning a task the gate refused; loosening any Day 05 threshold
ThermalAdmissionGateFail-closed admission and mid-task shed trigger: forecast + reserve under planner ceiling; Days 17–26 greenClearing supervisor stage; a “it’ll be fine, just this once” flag
Day 05 BMS / FOC / drive firmwareMeasured-temperature derate curves, current limits vs pack temperature and SOC, chopper and drive self-protection, POWER_GATEDTaking derate requests from the soft layer

Core thesis: every thermal mass in the robot (windings, housings, gearboxes, drive electronics, battery pack, brake resistor, compute) is a measured state with a per-unit model. The twin forecasts each one over the planned task with a pessimistic band. The scheduler is only allowed to plan inside a planner ceiling that sits below Day 05’s derate start by a margin plus the heat a safe stop would cost from that state. Forecasts are soft and can only refuse or reshape work. Day 05’s derate stays exactly where Day 05 put it, and if the robot ever reaches it, that’s a forecast failure to investigate, not a normal operating point.

Where the heat goes: the thermal network of one joint

Copper loss in a PMSM, in the amplitude-invariant dq frame Day 02 used, is

Pcu=32 R(Tw)(id2+iq2),R(Tw)=R0(1+α (Tw−T0)),α≈0.00393 K−1P_{cu} = \tfrac{3}{2}\,R(T_w)\left(i_d^{2} + i_q^{2}\right), \qquad R(T_w) = R_0\left(1 + \alpha\,(T_w - T_0)\right),\quad \alpha \approx 0.00393\ \mathrm{K}^{-1}

That heat lands in the windings first, then crosses into the stator and housing, then into the limb structure and air. The simplest model that behaves correctly is two nodes:

Cw T˙w=Pcu−Tw−ThRwh,Ch T˙h=Tw−ThRwh+Piron+Pgear−Th−TaRhaC_w\,\dot T_w = P_{cu} - \frac{T_w - T_h}{R_{wh}}, \qquad C_h\,\dot T_h = \frac{T_w - T_h}{R_{wh}} + P_{iron} + P_{gear} - \frac{T_h - T_a}{R_{ha}}

The two nodes have very different time constants. The winding node (RwhCwR_{wh} C_w) responds in seconds to tens of seconds. The housing node (RhaChR_{ha} C_h) responds over many minutes. That split is the whole story of peak vs continuous torque: a short burst heats the copper before the housing has noticed, and a long task fills the housing so that every later burst starts from a higher floor.

Things the model makes obvious:

  • The thermistor isn’t the hot spot. A sensor on the end turn or the housing lags the hottest copper by seconds to tens of seconds. That’s why ThermalStateEstimator exists: it runs the two-node model forward from measured current, corrects it with the thermistor, and re-anchors it with the Day 26 winding-resistance measurement whenever the joint is at rest. Its output is labeled ESTIMATED, never MEASURED.
  • Resistance rises with temperature, so heat makes more heat. At constant current, PcuP_{cu} grows as the winding warms. With a single lumped resistance RthR_{th} to ambient, a steady state exists only if 32 R0 α i2Rth<1\tfrac{3}{2}\,R_0\,\alpha\, i^2 R_{th} \lt 1. Real motors stay well inside that, but the effect means a joint that sits near its limit heats faster than a linear model predicts.
  • Hot magnets weaken. Day 26 noted NdFeB loses roughly 0.1% of its flux per °C while hot. Lower flux means lower KtK_t, which means more current for the same torque, which means more heat. Forecasts must use KtK_t at the predicted magnet temperature, not at the cold nameplate.
  • Wear is heat. Day 26’s rising friction is torque the motor spends without doing work. A worn knee runs hotter on the same task. Thermal model parameters are per unit and get re-identified after any Day 26 recalibration or part swap.
  • Mounting changes everything. RhaR_{ha} on a bench fixture is not RhaR_{ha} inside a carbon-fiber thigh with a cover on. You identify it in the limb, on the robot.

Headroom: how much torque over the next H seconds

Here’s the planning question in closed form. Take a single lumped node (conservative only if you use the winding time constant, more on that below) with thermal resistance RthR_{th}, time constant τ=RthC\tau = R_{th} C, ambient TaT_a, current temperature T0T_0, and a ceiling TceilT_{ceil}. Holding constant loss PP for HH seconds gives

T(H)=Ta+PRth+(T0−Ta−PRth)e−H/τT(H) = T_a + P R_{th} + \left(T_0 - T_a - P R_{th}\right) e^{-H/\tau}

Solve for the largest loss that keeps T(H)≤TceilT(H) \le T_{ceil}:

Pmax(H)=Tceil−Ta−(T0−Ta) e−H/τRth(1−e−H/τ),imax(H)=Pmax(H)32 R(Tceil)P_{max}(H) = \frac{T_{ceil} - T_a - (T_0 - T_a)\, e^{-H/\tau}}{R_{th}\left(1 - e^{-H/\tau}\right)}, \qquad i_{max}(H) = \sqrt{\frac{P_{max}(H)}{\tfrac{3}{2}\,R(T_{ceil})}}

and the available joint torque is τavail=N η Kt(Tmagnet) imax\tau_{avail} = N\,\eta\,K_t(T_{magnet})\,i_{max}, still capped by the drive’s peak current and the motor’s saturation. As H→∞H \to \infty this becomes the continuous rating (Tceil−Ta)/Rth(T_{ceil} - T_a)/R_{th}. As H→0H \to 0 it’s limited only by the peak current.

A worked example with made-up but plausible numbers (not a specific motor): Ta=30T_a = 30 °C, planner ceiling Tceil=100T_{ceil} = 100 °C, Rth=1.0R_{th} = 1.0 K/W, τ=240\tau = 240 s, phase resistance 0.10 Ω at 25 °C (so about 0.13 Ω at 100 °C).

Starting stateHorizonPmaxP_{max}imaxi_{max}Torque vs cold 60 s
Cold, T0=30T_0 = 30 °C60 s≈ 316 W≈ 40 A100%
Warm, T0=70T_0 = 70 °C60 s≈ 176 W≈ 30 A≈ 75%
Anycontinuous70 W≈ 19 A≈ 47%

Same joint, same minute of work, a quarter less torque because of what it did earlier. That number is what the scheduler needs, per joint, before it starts a task.

Two cautions about this formula:

  1. Use the right time constant for the horizon. If you lump winding and housing into one node with the slow housing τ\tau, short-horizon headroom comes out far too optimistic, because the real copper heats much faster. The forecaster runs the two-node model; the closed form is for intuition and quick sanity checks.
  2. RMS torque only works when the cycle is short. The classic duty-cycle rule, τrms=1T∫0Tτ2 dt≤τcont\tau_{rms} = \sqrt{\tfrac{1}{T}\int_0^T \tau^2\,dt} \le \tau_{cont}, is valid only when the cycle period is much shorter than the winding time constant. A gait cycle of about a second qualifies. A “lift for 40 s, rest for 40 s” pattern doesn’t: the peak inside each lift matters, and RMS will hide it.

The other thermal masses

Joints get the attention, but four other budgets end tasks just as often.

MassHeat sourceTime constant (typical order)Measured byOwner when it trips
Gearbox lubricant(1−η) Pmech(1 - \eta)\,P_{mech}; efficiency drops when cold, so cold starts cost more motor currentMany minutesThermistor on housing; friction probe band (Day 26)Day 05 rule on MEASURED gearbox temp
Drive MOSFETsConduction i2Rds(on)i^2 R_{ds(on)} plus switching loss, rising with PWM frequency and bus voltageMilliseconds to secondsNTC on the drive boardDrive firmware self-protection (hard, local)
Battery packI2RintI^2 R_{int} plus a smaller reversible term; cells near the pack center run hottestTens of minutesBMS cell thermistorsDay 05 BMS current-limit tables vs temperature and SOC
Brake resistorRegenerated energy the pack can’t accept (full SOC, cold pack) during descents and sit-downsSeconds to minutesResistor thermistor; chopper dutyDay 05 chopper protection
Compute SoCInference and perception load; fan or heat-pipe health; ambientSeconds to minutesJunction temps; read-back clock frequencyDay 15 policy deadline / Day 17 supervisor fallback

Two of those deserve a sentence each:

  • The brake resistor is the surprise. A robot that charged to 100% and then walks down stairs regenerates energy the BMS won’t accept. It goes into the brake resistor. A long descent at full charge can trip chopper protection, and the robot loses the ability to brake its joints regeneratively at exactly the wrong moment. The forecaster models regen energy against pack acceptance, not just joint heat.
  • Compute heat is a timing constraint. When the SoC throttles, the clock drops and a compute-bound policy’s inference latency rises roughly in proportion: a 30% clock cut is about a 1.4× slower step. Day 15 measured the policy’s latency budget; Day 17’s supervisor falls back when it’s missed. The forecaster treats the read-back clock as MEASURED and forecasts deadline misses before they happen. Never assume the clock you configured is the clock you got.

All of these share one bus. The sum of joint electrical power, compute, and losses has to fit inside the BMS’s current limit, which Day 05 lowers when the pack is hot or the SOC is low. A plan that fits every joint’s thermal budget can still fail the pack’s.

The planner ceiling and the safe-stop reserve

Day 05 defines a derate curve per joint: full torque below TderateT_{derate}, linearly reduced torque_scale to zero at TmaxT_{max}. That curve is HARD_SAFETY, changed only through Day 25’s hard path. The soft layer never moves it and never asks Day 05 to apply it.

The scheduler plans against a lower number. Let T^w+(t)\hat T^{+}_w(t) be the forecaster’s pessimistic band edge for the hot spot at time tt in the task, and let ΔTstop(t)\Delta T_{stop}(t) be the temperature rise the twin predicts for a controlled stop (sit, kneel, or stance-and-hold, whatever the supervisor’s safe-stop is from that posture) starting at tt. The admission rule is

max⁡t ∈ [0, H](T^w+(t)+ΔTstop(t))  ≤  Tceil=Tderate−m\max_{t \,\in\, [0,\,H]} \Big( \hat T^{+}_w(t) + \Delta T_{stop}(t) \Big) \;\le\; T_{ceil} = T_{derate} - m

for every joint, with a margin mm that covers estimator error on that unit. In words: at every moment of the task, the robot must still be able to stop safely without entering derate. Push recovery and the emergency step from Day 09 get the same treatment as a separate reserve on the joints they load (hips, knees, ankles).

The scheduler then has a short list of honest moves when a task doesn’t fit:

  • Rest. Insert a cool-down in a low-torque posture. The forecaster says how long, from the housing time constant.
  • Pick a cheaper posture. Holding torque at the knee scales roughly with body weight times the horizontal offset between knee and center of mass. A straighter stance or a supported lean (Day 13 affordances) can cut it a lot. Posture is a soft reference into Day 07’s WBC; the QP still owns feasibility.
  • Alternate limbs. Switch the carrying arm, lead with the cooler leg on stairs.
  • Split the payload, or slow the motion. Time spent accelerating is where peak current goes.
  • Hand the task to another robot. The fleet layer (Day 21) can see which unit has headroom.
  • Refuse. Better at admission than mid-carry.

What the scheduler may not do: raise torque_scale, shift TderateT_{derate}, disable the stop reserve, or retry a refused task with a more optimistic band.

Admission and graceful shedding mid-task

The mid-task check matters as much as admission. If measured temperatures climb above the pessimistic band edge, the model is wrong right now, maybe a fan is clogged, the room is hotter than the ambient sensor says, or Day 26 wear has added friction. The gate triggers a graceful shed: set the payload down, move to a rest posture, and let the supervisor know. That shed itself was budgeted, because the stop reserve was in the admission check. A thermal residual outside the band is also a Day 18 bag event and flips the unit’s model validity to RED until it’s re-identified.

Thermal states of a joint

Two details:

  • COLD is its own state. Day 26 said friction depends on grease temperature. A cold harmonic drive is less efficient, so the motor draws more current for the same output. Plenty of headroom, worse efficiency, and probes taken now are out of band. Some robots run a short warm-up routine before admitting hard tasks.
  • Hysteresis on the way back. Re-admission waits until the forecast clears by a margin, or the robot oscillates between working and resting every few seconds.

Identifying the per-unit thermal model

You can’t forecast what you haven’t identified, and catalog values won’t do.

  1. Bench step test per actuator type. Locked rotor or a dynamometer, several constant current levels, log thermistor and resistance-derived winding temperature during heating and cooling. Fit CwC_w, RwhR_{wh}, ChC_h, RhaR_{ha} by least squares. The cooling curve after power-off isolates the housing time constant cleanly.
  2. Re-identify in the limb, on the robot. Run a fixed thermal probe (versioned, like Day 26’s probe) in a quiescent window: a known current profile on a lifted limb, then a cool-down. RhaR_{ha} and sometimes ChC_h change a lot once the motor is mounted inside a cover.
  3. Per unit, re-done after a Day 26 recal or part swap. A new actuator is a new thermal model. The thermal parameters go in the CalibrationEvent and the attestation hash.
  4. Validate before trusting. Replay real task bags through the twin with the identified model and compare predicted against measured temperature. The pessimistic band must contain the measured trace at the coverage you claim (say, 95% of samples) on held-out tasks. That’s what model_validity: GREEN means.

The ambient sensor is part of the model. A site that runs 8 °C hotter in summer (Day 25’s per-site config) shrinks every joint’s continuous rating by the same 8 °C of headroom.

Ownership conflicts

ConflictWinnerBehavior
Forecast says fine, measured temperature above pessimistic edgeMeasuredGraceful shed; model validity RED
Thermistor reads lower than estimated hot spotEstimated hot spot for planning; MEASURED for Day 05Plan on the hotter number; Day 05 acts on its own measured inputs per its rule
Scheduler wants a task the gate refusedThermalAdmissionGateRefused; scheduler may reshape or rest, not retry with a looser band
Planner wants to “use up” headroom to the derate lineDay 05 + gateCeiling sits below derate by margin plus stop reserve
Task needs the stop reserve to fitStop reserveTask refused or split; the reserve is never spent on work
Soft layer asks Day 05 to derate early “to be safe”Day 05Not accepted; the soft layer sheds work instead
Forecast labeled MEASURED in a bagDay 18 hygieneQuarantine; forecasts are SOFT
Configured clock vs read-back clockRead-back clockLatency forecast uses what the SoC actually runs at
Joints fit, pack doesn’tBMS limit (Day 05)Task refused or slowed; per-joint fit isn’t enough
Thermal model from bench, robot is the field unitOn-robot identificationBench model only seeds the fit
Part swapped, old thermal model keptDay 26 RecalibrationGateRED until the new unit’s thermal model is identified and attested
Thermal threshold change pushed as SOFT_POLICYDay 25Derate thresholds are HARD_SAFETY; mixed-class change refused
Shed during an open incidentDay 23Incident coordinator decides; shed still allowed as a safe action

Shared API

Same wire discipline as Days 02/04: everything carries BusHeader. The estimator runs on the host at a modest rate; nothing here enters the cyclic current loop. Drive firmware and BMS self-protection stay local and hard.

BusHeader: t_mono seq clock_domain # CYCLIC for drive temps/currents; HOST for estimator/forecast age_ms producer_id ThermalMeasurement ⊇ BusHeader: # MEASURED robot_id source # WINDING_NTC | HOUSING_NTC | WINDING_R_AT_REST | GEARBOX_NTC # | DRIVE_NTC | PACK_CELL | BRAKE_RES | SOC_JUNCTION | AMBIENT location # joint or pack/cell id temp_c soc_clock_mhz_readback # SOC_JUNCTION only bag_ref ThermalState ⊇ BusHeader: # ESTIMATED, per unit, per joint robot_id joint thermal_model_ref # per-unit params; in CalibrationEvent + attestation t_winding_hot_c # ESTIMATED t_housing_c # MEASURED-anchored t_gearbox_c kt_at_magnet_temp residual_c # measured minus predicted, last window model_validity # GREEN | YELLOW | RED label: ESTIMATED ThermalForecast ⊇ BusHeader: # SOFT task_id horizon_s per_joint[]: band_c[] # [median, pessimistic] over horizon stop_reserve_c[] # ΔT_stop(t) from twin time_to_ceiling_s pack_band_c[] bus_power_peak_w regen_into_brake_j soc_latency_forecast_ms label: SOFT forbid: label_measured: true write_torque_scale: true DutyCyclePlan ⊇ BusHeader: # SOFT task_order[] rests[] # duration · posture limb_assignment posture_refs # soft refs into Day 07 WBC handoff_robot_id # optional, via Day 21 forbid: raise_torque_scale: true move_derate_thresholds: true spend_stop_reserve: true ThermalAdmissionGate ⊇ BusHeader: fail_closed: true soft_admit_blocker_only: true status # RED | YELLOW | GREEN require: state_fresh: true # age_ms under bound model_validity_green: true ambient_measured: true band_plus_reserve_under_ceiling: true # every joint, every t pack_and_bus_inside_bms_limits: true # Day 05 brake_resistor_inside_budget: true soc_latency_inside_deadline: true # Day 15 supervisor_armed: true # Day 17 hygiene_honest: true # Day 18 offline_shadow_canary_green: true # Day 19 regression_gate_green_for_unit: true # Day 20 fleet_admit_gate_green: true # Day 21 fleet_canary_gate_green: true # Day 22 no_open_incident_on_unit: true # Day 23 canary_reopen_gate_green: true # Day 24 cross_site_config_gate_green: true # Day 25 recalibration_gate_green: true # Day 26 estop_pairing: true day05_binding: true refuse_on[]: stale_thermal_state model_validity_red forecast_labeled_measured plan_into_derate stop_reserve_missing pack_limit_exceeded configured_clock_assumed bench_model_on_field_unit thermal_threshold_as_soft_policy shed_on[]: measured_above_pessimistic_edge reserve_would_be_breached soc_deadline_miss_forecast forbid: joint_command: true dual_write_torque_scale: true clear_supervisor_stage: true force_flag: true # Day 26 CalibrationEvent — extended CalibrationEvent ⊇ BusHeader: # … Day 26 fields … thermal_model_ref thermal_probe_version # Day 05 — unchanged owner PowerState / BmsCommand ⊇ BusHeader: torque_scale POWER_GATED derate_curve[joint]: # HARD_SAFETY, Day 25 hard path only t_derate_c t_max_c pack_current_limit(temp, soc) chopper_protection accepts_requests_from_soft_layer: false

Physical ↔ digital pairing

PhysicalDigital twin / backing
Per-joint winding and housing thermal masses, mounted in the limbTwo-node model per unit, identified on the robot, carried in calibration and attestation
Thermistor lag behind the copper hot spotObserver runs from measured current; re-anchored by winding R at rest
KtK_t falling as magnets heatForecast uses KtK_t at predicted magnet temperature
Friction from Day 26 wearSame friction fingerprint feeds the loss model; worn joints forecast hotter
Standing in a crouchTwin computes holding torque per posture; scheduler compares postures
Stairs down at full chargeTwin integrates regen energy vs pack acceptance; forecasts brake resistor heat
SoC throttling in a hot roomTwin forecasts clock and inference latency from read-back history and ambient
Pack heating over a shiftPack model forecasts BMS current-limit changes before they bind
Safe-stop and push-recovery maneuversTwin pre-computes their per-joint temperature cost from every posture class
A real derate happeningBag event; replayed through the twin; if the twin didn’t predict it, the model is RED

If the twin can’t predict a derate that the robot actually hit, it can’t schedule around the next one either. Every Day 05 derate in the field is a test case for the forecaster.

Bring-up sequence (before trusting thermal scheduling)

  1. Days 07–26 green. Thermal parameters ride in Day 26’s calibration events; without that path there’s nowhere honest to put them.
  2. Instrument every thermal mass. A winding thermistor per joint is the minimum. Add housing and gearbox sensors on the high-load joints, and make sure the SoC reports its actual clock.
  3. Bench step tests per actuator type to seed the model.
  4. On-robot thermal probe to re-fit the mounted values, per unit.
  5. Validate the band against real task bags it didn’t train on. Write down the coverage you measured.
  6. Compute reserves for the safe stop and for push recovery from each posture class.
  7. Dry-run the gate. Stale state, a plan that touches derate, a missing reserve, a bench model on a field unit, an assumed clock, a pack limit exceeded. Every one must go RED.
  8. Provoke a shed on the gantry. Block a cooling path or heat the room until measured temperatures leave the band, and confirm the robot sets the payload down and rests without Day 05 ever engaging.
  9. Then let the scheduler plan real shifts, and treat every field derate as a failed forecast to replay.
SymptomLikely cause
Robot drops a box on the fourth trip up the stairs, never on the firstHousing heat accumulated across trips; scheduler planned from cold headroom
Short lifts look fine in the forecast but the knee deratesOne-node model with housing time constant; copper hot spot heats much faster
Push recovery fails late in a shiftNo stop or push reserve; budget spent on work
Derates on summer afternoons at one site onlyAmbient not measured, or fleet-wide default ambient
Forecast wrong on one robot after a repairOld thermal model kept after part swap; not re-identified
Brake resistor trips walking downstairs after chargingRegen at full SOC not modeled; pack couldn’t accept energy
Policy fallback events cluster in a warm roomSoC throttled; latency forecast used configured clock
Robot oscillates between work and rest every few secondsNo hysteresis on re-admission
Every joint fits but robot browns out on a combined movePer-joint budgets checked, bus and pack limit not
Worn joint derates first, every timeDay 26 friction not fed into the loss model
A dashboard shows “time to derate” as fact and someone extends a task on itForecast labeled MEASURED; scheduler used the median, not the pessimistic edge

What to freeze this week

Extend frames and your thermal config with:

  • A two-node thermal model per joint per unit, identified on the robot with a versioned thermal probe, carried in Day 26’s CalibrationEvent and Day 25’s attestation.
  • ThermalStateEstimator output labeled ESTIMATED, re-anchored by measured winding resistance at rest, with a measured-vs-predicted residual and a validity state.
  • Models for gearbox, drive, pack, brake resistor, and SoC, each with its measured source and owner when it trips.
  • A planner ceiling per joint below Day 05’s derate start, and a safe-stop plus push-recovery reserve per posture class that the scheduler can never spend.
  • ThermalAdmissionGate fail-closed on its refuse list, with graceful shedding when measured temperature leaves the pessimistic band.
  • Day 05’s derate curves as HARD_SAFETY, changed only through Day 25’s hard path, never accepting requests from the soft layer.
  • Every field derate captured in a Day 18 bag and replayed through the twin as a forecaster regression test.

The lesson isn’t “don’t let motors overheat.” Drive firmware and Day 05 already make sure they don’t. It’s that heat is the slowest-moving state in the robot and the one that decides whether the next task, and the next push, is still possible. You see it with measured sensors and a per-unit model, you plan against its pessimistic forecast with a stop reserve held back, and you leave the derate line exactly where Day 05 drew it.

Next

Day 28+ — Energy budgets and battery mission planning: state of charge and state of health as measured constraints, return-to-dock reserves, charge scheduling across the fleet, cold-pack and fast-charge limits, and battery swap as a measured per-unit event under the same gates.