LessonsDay 12 — Multi-contact transitions / object-as-support

Day 12 — Multi-contact transitions / object-as-support / loco-manip scheduling

Multi-contact transitions: ContactSchedule promote–demote across feet, hands, and OBJECT under one WBC/QP; measured ContactState owns the hard set

Day 11 owned promoting measured hand contact into the Day 07 hard support set beside the feet — CLAIM without measure forbidden, mid-contact demote on flicker / stale / POWER_GATED, still one plant. Day 10 owned soft EE / grasp on FREE limbs. Day 09 owned mid-event abort and RecoveryCommand. Day 08 owned gait modes vs measured contact_set. Day 07 owned the feasible program. Day 06 owned the estimate. Day 05 owned sag honesty.

Today owns the contact schedule: sequenced promote–demote across feet, hands, and grasped objects (object-as-support when measured), without a second plant and without fighting Day 08 gait clocks or Day 09 recovery. Schedules are intent that wait for measurement. Measured contact still owns the hard set.

Contact schedule is ownership of transitions, not a prettier constraint clock

A multi-contact “choreography” that attaches hand and object cones because the schedule clock said t=1.2 st = 1.2\,\mathrm{s} is just CLAIM-as-truth with more limbs. The schedule proposes who should take load next; measurement admits them; demotion is mandatory when confidence, wrench agreement, or ceilings fail mid-transition.

LayerOwnsMust not own
Contact scheduleOrdered promote / hold / demote intent across feet, hands, OBJECT slotsFriction cones / FOC / BMS / gait truth
Measured contactMembership in hard contact_set (FOOT | HAND | OBJECT) with confidenceTeleop or schedule wish as constraint truth
Gait (Day 08)Intended DS/SS/swing clock vs measured feetBeing overridden by object-plant timing
Recovery (Day 09)Mid-disturbance abort / emergency stepLosing the writer fight to a stuck OBJECT_SUPPORT hold
Soft tasksEE / grasp / posture on FREE limbs onlyParallel “object balancer” plant
HonestyMid-transition stale / POWER_GATED / flicker / wrench disagree → abort/soften/demoteHeroic completion of the next schedule phase into brownout

Core thesis: multi-contact transitions consume the same EstimatorState + Day 07 friction / unilaterality + torque_scale. A ContactSchedule (or thin MultiContactCommand) sequences CLAIM → wait-for-measure → PROMOTE → HOLD → DEMOTE across limbs and grasped objects. SupportContact.kind = OBJECT joins the hard set only when measured and wrench-agreed. Soft EE remains for FREE limbs. There is still one QP face — not a schedule-driven second plant that finishes a crate brace into a collapsing bus.

Ownership rule: one writer for schedule / multi-contact intent and one writer for measured contact_set. When they disagree mid-transition, measured contact wins for constraints. Intent aborts, softens, retimes, or waits — it does not attach OBJECT cones because the choreography said “lean on the crate now.” Day 08 gait and Day 09 recovery outrank a stuck schedule hold.

How today fits the Days 05–11 stack

DayWhat you already frozeWhat Day 12 reuses
05torque_scale, POWER_GATED, sag honestySame ceilings bind every joint through every promote/demote
06EstimatorState, age / stale, contact modesOBJECT / hand / foot SUPPORT consume the same estimate
07Tasks vs hard friction / unilateralityNew contacts join the hard set only when measured
08Gait modes vs measured contact_setSchedule must not fight gait clocks; feet stay honest
09Mid-event abort / soften; RecoveryCommandMid-transition abort; recovery preempts schedule holds
10Soft EE / grasp; FREE vs CLAIM honestyCLAIM without measure still forbidden for every slot
11MEASURED_SUPPORT hands; LOCO_MANIPHands remain first-class; OBJECT is the new measured kind

Do not bolt a “multi-contact optimizer” that writes JointCommand beside the QP when the schedule advances. That is Day 10’s second-plant anti-pattern wearing a crate-brace demo.

Promote–demote sequencing across feet, hands, and objects

Day 11’s hand honesty table generalizes to a per-slot lifecycle:

Slot phaseMeaningAllowed today
FREENo trusted load for this link / object frameSoft EE / grasp only
CLAIMSchedule wants this slot to take weight nextApproach / soft contact seek — no hard cones yet
MEASUREDLink (or grasped object contact) in measured contact_set with healthy confidence + wrench agreementEligible to promote
PROMOTE / HOLDHard friction + Fz≥0F_z \ge 0 attached; soft EE on that limb dropped to residualWeight transfer under expanded support
DEMOTELeave hard set on flicker / stale / gated / schedule unloadSoft EE may return only if intentionally FREE again

Sequencing rules (all required):

  1. One promote at a time (or a documented simultaneous pair) — no “attach every cone the schedule listed this tick.”
  2. Intent CLAIMs the next slot; measurement must confirm before cones attach.
  3. Demote the unloading contact only after the loading contact is MEASURED and the QP stays feasible — never free a still-loaded sole or palm to clear a prettier pose.
  4. OBJECT slots require grasp integrity and object–world wrench agreement (not just “fingers closed”).
  5. Mid-sequence POWER_GATED / stale / recovery → freeze or abort the schedule; do not advance phases.

Demotion is success when the crate slipped, the palm flickered, or the pack sagged. A robot that always finishes the next schedule beat into a collapsing bus is ignoring Day 05 with a prettier multi-contact demo.

Object-as-support honesty

A grasped crate, handrail, or table edge is not an end-effector weight. It is a candidate SupportContact with kind = OBJECT that joins the hard set only when:

GateRequired
Grasp integrityFingers / clamp still measured closed; grasp age inside budget
Object contactObject–world (or object–robot) contact in measured set with confidence
Wrench agreementEstimated object wrench consistent with expected support normal / mu
Schedule CLAIMIntent allowed OBJECT_SUPPORT or MULTI_CONTACT for that slot
FeasibilityQP remains feasible after attaching object cones under current torque_scale

Forbidden: treating “we are holding something” as object-as-support; attaching object cones from grasp alone; using a second Cartesian plant to “balance through the crate”; promoting OBJECT while Day 09 recovery owns the mode.

Object frames, mu, and normals belong in the same documented cone family as feet and hands (Day 07 honesty). If you cannot name the contact frame and friction model, you are not ready to promote OBJECT.

Schedule vs gait / recovery — non-fight rules

Multi-contact scheduling is where teams accidentally create three writers on WbcTaskSet.mode. Freeze a priority:

ConflictWinnerSchedule behavior
Active RecoveryCommand (Day 09)RecoveryAbort / hold schedule; demote non-essential OBJECT/HAND supports if recovery needs feet-first escape
Gait swing / touchdown commit (Day 08)Measured feet + gait ownerRetime or pause OBJECT/HAND promote; never steal swing constraints mid-step
POWER_GATED / low torque_scalePower honestySoften / abort transition; no new promotes
Schedule CLAIM vs missing measureMeasured contactWait; soft seek only
Two schedule slots disagreeSingle schedule ownerOne writer; explicit priority_hint — no peer planners

Hard vs soft: support constraints on measured FOOT / HAND / OBJECT stay hard. Soft EE authority lives only on FREE limbs. If the QP goes infeasible under the expanded set, demote / abort / soften — do not silently drop an object cone so the choreography “makes it.”

Mid-transition abort / soften honesty

Transitions are where teams disable safety “just until the handoff settles.” Do not.

Signal mid-transitionRequired behavior
INPUT_STALE / confidence cliffFreeze schedule; demote newly promoted contacts that lost confidence; hold safest measured support
POWER_GATED / falling torque_scaleAbort remaining promotes; raise margins; never finish crate lean into brownout
Contact flicker / wrench disagreeDemote that slot to FREE/CLAIM; do not keep cones on noise
Grasp integrity lost on OBJECTImmediate OBJECT demote; treat as drop / recovery if CoM was biased onto it
Foot contact_set collapses mid-handoffYield to Day 09 recovery; schedule is not the escape owner
QP infeasible under expanded conesDemote newest promote and/or drop soft EE — do not drop unilaterality
Recovery assertsPreempt schedule writer; clear or soften MULTI_CONTACT hold

Abort, demote, and soften are success paths when the object lied, the wall was grease, or the pack sagged mid-handoff.

Shared API: schedule + OBJECT on the same stack

Keep Day 02 / 04 wire honesty. Cyclic commands still carry BusHeader. Extend Day 10–11 ManipulationCommand / WbcTaskSet and Day 06–08 ContactState — do not invent a parallel “multi-contact bus”:

BusHeader: node_id, seq t_sample, clock_domain, age_budget_ms faults # Upstream (read-only here) EstimatorState, PowerState ⊇ BusHeader ContactState ⊇ BusHeader: contact_set[] # feet, hands, AND objects when measured SupportContact: link_id / frame # e.g. left_foot, right_palm, crate_top kind # FOOT | HAND | OBJECT mu, normal, wrench_est? confidence, age_ms flags # settling / flicker / gated / grasp_lost parent_grasp_id? # for OBJECT: which grasp frames this support # Thin multi-contact face (host / mid-rate) ContactSchedule ⊇ BusHeader: # or MultiContactCommand intent # IDLE | MULTI_CONTACT | OBJECT_SUPPORT | ABORT slots[]: target_frame # FOOT / HAND / OBJECT frame phase # FREE | CLAIM | PROMOTE | HOLD | DEMOTE earliest_t / latest_t? # soft timing hints — NOT constraint truth priority_hint yield_to # GAIT | RECOVERY | POWER # explicit non-fight relax_on_fault # stale / POWER_GATED / flicker / grasp_lost → abort/demote # Extends Day 10–11 manipulation face (optional merge) ManipulationCommand ⊇ BusHeader: intent # … | CLAIM_SUPPORT | LOCO_MANIP # | OBJECT_SUPPORT | MULTI_CONTACT | ABORT ee_refs[] / hand_refs[] hand_role[] / support_claim[] object_claim[] # which OBJECT frames intent wants loaded schedule_ref? # link to active ContactSchedule id relax_on_fault # Extended Day 07–11 task face WbcTaskSet ⊇ BusHeader: mode # STANCE_DS | STANCE_SS | SWING | IMPACT | RECOVER_IP # | MANIP | HAND_SUPPORT | LOCO_MANIP # | OBJECT_SUPPORT | MULTI_CONTACT | ... com_ref / capture_ref? foot_refs[] hand_support_refs[]? object_support_refs[]? # residual contact / unload bias for MEASURED OBJECT ee_refs[] # soft EE — FREE limbs only hand_refs[] posture_bias? priority_order[] relax_on_fault # Downstream muscle (Day 02) — ceilings still reflect torque_scale JointCommand ⊇ BusHeader: q_des? / qd_des? / tau_ff? iq_ceiling? / tau_ceiling? flags # STO / soften / hold

Higher layers publish schedule / object-support intent. Measured ContactState owns support membership. Gait and recovery keep their writers. Rate loops enforce BMS ceilings. Nobody re-implements FOC or AHRS inside the multi-contact choreographer.

Physical ↔ digital pairing for multi-contact transitions

PhysicalDigital twin / backing
Same EstimatorState under changing support membershipNo perfect-state schedule that always promotes on time
OBJECT frame normals / mu vs real crate / railMatched cone params or logged tables as Day 07 feet
Grasp integrity + object wrench vs schedule CLAIMTwin must delay / drop object contact; claim alone never enables cones
Promote then demote handoff under sagtorque_scale replay — no infinite-torque brace through the crate
Mid-transition flicker / grease slip / grasp popInjected contact dropout mid-handoff; demote path proven
Schedule vs gait collision (plant during swing)Twin must show yield/retime — not silent gait override
Recovery preempt during OBJECT holdInjected push mid-HOLD; schedule aborts, recovery owns mode
Mid-rate schedule tick + jitterCannot beat hardware cadence or hide age faults

If the twin always promotes on the schedule clock with sticky OBJECT contacts and a full pack while hardware sees delayed contact_set and sag, you will tune handoff gains forever and never ship a transition that survives a tired bus.

Bring-up sequence (before free multi-contact choreography)

Days 07–11 green (stance, step, recovery, FREE-hand reach, measured hand SUPPORT / loco-manip with mid-contact faults proven). Then:

  1. Days 07–11 green — hand SUPPORT abort paths still behave; no open recovery or gait fights.
  2. Single-slot script — CLAIM → wait for MEASURED → PROMOTE → HOLD → DEMOTE on one known surface or fixed object; feet remain primary; confirm QP feasible.
  3. Two-slot handoff — scripted promote of B only after A is healthy; demote A only after B holds load share; monitor wrench share and torque_scale.
  4. OBJECT-as-support — grasped object with documented frame/mu; confirm grasp_lost and wrench-disagree demote; no CoM bias onto OBJECT until MEASURED.
  5. Non-fight + mid-transition faults — force schedule-during-swing, recovery-during-HOLD, stale / gated / flicker / grasp pop in twin and on hardware; confirm yield / abort / demote, not heroic completion.
  6. Then add teleop or learned residuals that choose schedule slots / timing above the QP — never replace cones, FOC, torque_scale, gait, or recovery writers. Perception-driven affordances and richer schedule discovery wait for Day 13+.

Skip to “RL multi-contact dances in sim” and hardware’s first real crate handoff becomes an unplanned tip / brownout experiment with better video.

SymptomLikely cause
Promotes on air / tips mid-handoffSchedule phase treated as MEASURED; cones without contact_set
Twin handoffs, hardware faceplantsPerfect OBJECT contacts / infinite torque_scale in sim
Completes crate lean into brownoutMid-transition abort missing; ceilings not consulted
Object “wins,” foot slipsSoft EE or schedule treated as hard; unilaterality dropped
Grasp-only “object support”OBJECT promoted without object–world wrench / contact gate
Chatters on every brushAccidental contact promoted without confidence / wrench gate
Second plant for object braceParallel optimizer writing JointCommand; fights Day 07 program
Schedule freezes loaded sole for poseIntent owns foot constraints instead of measured feet
QP infeasible → silent cone dropDemote/abort path missing; “make it feasible” anti-pattern
Gait / recovery fights scheduleMultiple writers on WbcTaskSet / mode; no arbiter
Swing stolen by OBJECT promoteSchedule did not yield to Day 08 gait commit
Net learns only on sticky cratesResidual learned without flicker / sag / delayed contact / grasp pop

What to freeze this week

Extend frames and your control config with:

  • OBJECT support frames, normals, mu, grasp_id linkage, and wrench / confidence gates aligned with feet and hands
  • Who owns ContactSchedule intent vs measured contact_set vs gait vs recovery (disagree → wait/yield/demote; recovery and gait outrank schedule holds)
  • SupportContact.kind = OBJECT + grasp_lost / flicker flags
  • ContactSchedule / MultiContactCommand phases FREE → CLAIM → PROMOTE → HOLD → DEMOTE with yield_to
  • WbcTaskSet modes OBJECT_SUPPORT / MULTI_CONTACT; soft EE only on FREE limbs
  • Mid-transition abort / demote for stale, POWER_GATED, low torque_scale, flicker, and grasp integrity loss
  • Twin hooks: matched object loads, contact delay/dropout, grasp pop, schedule-vs-gait collisions, sag under handoff peaks — same as hardware
  • Bring-up gate: no free multi-contact choreography / learned schedules until steps 1–5 above are green

The lesson is not “play a contact MIDI file until the robot looks busy.” It is make multi-contact transitions the same contact-rich program in silicon and in the twin: one estimate, honest power ceilings, measured FOOT/HAND/OBJECT in the hard support set, schedules that wait for measurement and yield to gait/recovery, soft tasks only on FREE limbs, and abort / demote paths that stay honest when the object or the pack lies mid-handoff.

Next